LE-300 Wind Turbine Advanced Kit 12/24/48V

£2,130.40 £2,120.00 SAVE 0%
IN STOCK - 1-2 DAY DISPATCH

Voltage: 12V

12V
24V
48V

Accessories: Guyed Tower Kit

Guyed Tower Kit
Turbine Only

Nexy Day Delivery Available! Ends in:

(Order before midday on a business day)

%-D%!D:Day,Days; %-H%!H:hour,hours; %-M%!M:min,mins; %-S%!S:sec,secs;

apple paygoogle paymaestromasterpaypalvisaklarnaamerican express

Description:

If you are interested in purchasing a wind turbine, please email sales@callidustrade.co.uk for further information Perfect for use in hybrid system comprising solar and wind, this LE-300 Wind Turbine Advanced Kit contains everything...

Description

If you are interested in purchasing a wind turbine, please email sales@callidustrade.co.uk for further information

Perfect for use in hybrid system comprising solar and wind, this LE-300 Wind Turbine Advanced Kit contains everything you need (except batteries & cables) to create a flexible renewable energy system.  It includes the Tristar 45A diversion charge controller, 300W dump load and a stop/start switch to be used when you want to stop the turbine for maintenance (not to be used in high winds).

The wind turbine is connected directly to the batteries and the Tristar charge controller is also connected to the batteries. When the batteries are fully charged, the controller diverts excess power generated by the wind turbine into the 300W dump load, dissipating the power as heat. A dedicated solar charge controller should be used as the solar and wind systems are parallel systems, both connected to the batteries.

Mount the turbine on a standard scaffold pole (48-50mm outer diameter).  We recommend the Guyed Tower Kit (available to purchase seperately), everything you need (guy wires, earth anchors, foundation plate etc) except for the pole which you need to source locally.

The wind turbine kit includes:


LE-300 Turbine (12V/ 24V/ 48v)
45A Diversion Charge Controller
300W Dump Load
Run / Stop Switch


Available to purchase separately.

Guyed Tower Kit will include:

Guy Wires

Earth Anchors

Foundation Plate

PLEASE NOTE THERE IS A 3-4 WEEK LEAD TIME ON WIND TURBINES

Additional Information
Voltage

12V, 24V, 48V

Accessories

Guyed Tower Kit, Turbine Only